Iron tower construction site management requirements
1. Unified production warning boards, system boards and project information boards shall be set up in an obvious place on the construction site.
2. All site construction personnel shall wear uniform clothes.
3. The construction site shall set up a warning line, install a red light at night and turn it on at night.
4. The safety officer shall be on duty with a certificate and wear the red safety officer armband.
5. All site personnel shall wear safety helmet correctly.
6, climb, electrician, welder and other special operations personnel with a license.
7. The pile height of the excavated earthwork shall be less than 1.5m, and the pile shall be no less than 1m away from the edge of the foundation pit.
8. Temporary electricity use on site shall be operated by qualified electricians, and the cables shall be insulated and sheathed, intact and without damage; Welding machines and other live working machinery to do a good job grounding and lightning protection; Complete power failure and demolition in time.
9. The materials on site should be placed in order, and the steel bars should be separated from the ground, so that they cannot be placed directly on the ground. In case of any rust, the steel bars should be removed from the rust and used only with the approval of the supervisor.
10. Management of mains power supply and equipment installation unit shall be executed with reference.