Attention points for decoration tower installation
The adornment tower that serves as adornment building, should consider a lot of respects factor in installation convenience, should do every pace operation carefully from installation begin.
1. Lifting matters: when the decoration tower starts to lift, the general commander on the ground and the commander in the upper air must pay close attention to the stress of the mast. The mast can be lifted only after it is fully stressed and confirmed to be free of problems.
2. Attachment installation: after the first main material is installed, the forklifts on both sides must be first closed, and then the other auxiliary materials can be hoisted. The lifting steel wire rope must be hung at the root of the scraper to reduce the transverse force of the scraper.
3. Construction weather: it is strictly prohibited to carry out lifting and high-altitude work in inclement weather such as rain, snow, dense fog, icing on the tower, high temperature at noon or gale force 6 or above.
4. Careful operation: it is strictly prohibited for unaccompanied personnel to enter within a radius of 15 meters, and double layer operation should be minimized. The ground operation personnel and the upper air operation personnel should cooperate with each other, and the upper air operation personnel should give signals and the ground operation personnel should respond in time.
5. Machine inspection: grinding driver should check and maintain grinding brake system and gear box regularly. Do not lift or lift without the signal of the conductor. It is forbidden to loose tail rope for loose grinding. Attention should be paid to whether the steering pulley will be detached or stuck when lifting the decorative tower. Check whether the ground grinding is fixed firmly. If there is any problem, report it to the commander and reinforce it in time.
6. Operation after installation: after the entire decoration tower body is installed, the perpendicularity is adjusted to the best state and the whole tower is bolted, the platform and ladder can be assembled on the ground before the platform and ladder can be hoisted. After the completion of the whole tower, the perpendicularity can be adjusted to the best state.
7. When hoisting the platform, large and one-sided should be hoisted first. The platform should be hoisted from top to bottom in order.
8, decoration tower ladder hoisting in order from top to bottom a hoisting.
9, must do a good job every day diary, the construction of some special circumstances processing errors, work progress and the responsibility of the workers working at height to make a detailed record.
10. After the completion of a single project, the construction team leader must personally inspect the tower, and the ground staff shall timely clean up the garbage around the tower and in the residence, settle all expenses payable, and make sure there are no remaining problems before coming out.