- Heavy duty cold formed U steel
- Power tower series
- Communication tower
- Wind tower series
- TV tower series
- Process tower series
- Single-tube towe
- Cable tower series
- Microwave tower series
- Beautified antenna
- Railway electrification tower
- Lightning arrester
- The bionic tower
- Steel net frame
- Integrated base station
- Container room
Communication tower workplace safety instructions
In order to attract the attention of pedestrians and vehicles of all kinds, it is necessary to set up signal signs at the following places for construction, using red flags during the day and red lights or paper at night. Fencing should be installed when necessary and the assistance of traffic police should be requested to ensure safety.
The corner of a street or highway.
Obstructing pedestrians or vehicles on the street.
(3) when it is necessary to temporarily stop the vehicles for erecting lines or laying cables across the road.
(4) joints for overhead electric (optical) cables.
(5) the manhole which has been uncovered.
2. The signal shall be transferred according to the change of the working place, and shall be removed immediately after the completion of the work.
Where it is necessary to block the passage of highways or streets, prior approval shall be obtained from the local units concerned.
No red or red flags shall be used in construction near railways, Bridges or river courses used by vessels to avoid misunderstanding and accidents. Relevant marks shall be used.
5. During construction, all non-workers, especially children, shall be prevented from entering the construction area. Note: do not approach or touch the following:
(1) the lid of the hole, the hanger, the ladder that was raised, and the hanging.
(2) ignited blowtorch, floodlight, hot soldering tin, electric heating appliance, toxic chemical material, etc.
(3) ropes, pulleys, tongs and other materials in use.
(4) all kinds of mechanical equipment and tools in use: such as generators, inflators, gas cylinders, cranes, water pumps, winches, nail guns, electric drills, etc.
(5) all temporary facilities at the base of lines, electric (optical) cables and poles being set up.
(6) dig ditches, pits and holes in the highways and streets, cover them with cover plates or build temporary Bridges when necessary, except where signs are needed, to ensure traffic safety.
The last:Communication tower lightning grounding requirements